KSH Chakan Park 4  ·  Commercial Proposal for Dover Group
● A2 Ready to Move ● A1 Ready to Move Chakan, Pune
KSH Chakan Park 4

Park Overview

An integrated industrial park in Chakan — Pune's premier manufacturing corridor — offering Buildings A1 and A2 for Dover Group's consolidated operations.

Chakan, Pune — Tal-Khed, Dist-Pune 410 501

Buildings A1 & A2 — Pre-Engineered Industrial Facility

Total Park Area
15.01 Acres
Total Chargeable Area
3,67,968 sq.ft
A1 Chargeable
2,40,773 sq.ft
A2 Chargeable
1,27,195 sq.ft
Power
800 kVA
Eave Height
9.20 m
Clear above FFL
Floor Load Capacity
6 T/m²
FM2 Laser Screed
Internal Roads
12 m
Bitumen/Concrete wide
Dock Canopy
6 m
Running along docking area
Building
A1
● Ready To Move in
Footprint
230.50 × 77.50 m
Bay Spacing
7.65 m c/c
Column Grid
15.30 × 25.51 m
Office Blocks
G+1 · 2 Blocks
Warehouse Chargeable 2,25,656 sq.ft
Office Chargeable 15,117 sq.ft
Total Chargeable 2,40,773 sq.ft
Building
A2
● Ready to Move In
Footprint
158.50 × 62.00 m
Bay Spacing
7.50 m c/c
Column Grid
15.00 × 20.23 m
Office Blocks
G+1 · 1 Block
Warehouse Chargeable 1,19,779 sq.ft
Office Chargeable 7,415 sq.ft
Total Chargeable 1,27,195 sq.ft
Park Facilities & Amenities
Full suite included in base building
Independent Park Access
Compound Wall — Full Perimeter
12m Wide Internal Roads
Rainwater Harvesting
Fire-Fighting Systems (NBC)
CCTV — Only Common Amenities. Building CCTV in Client Scope
Solar Optionality: Provision Considered
Property Management Services
MSEDCL Power Supply - KSH has considered at additional cost
MIDC / Bore Well Water
Truck & Visitor Parking
Sewage Treatment Plant (36 KLD)
Driver Rest Rooms
Landscaping
Polycarbonate Skylights
Developer Profile

KSH Infra

Inspiring Green Development — World-class warehousing and industrial infrastructure across India.

Pioneer in Customised &
Integrated Industrial Infrastructure

KSH Infra has a demonstrated track record of creating world-class facilities for MNCs from across the globe. Certified facilities are healthier, more productive, and reduce stress on the environment — resulting in energy savings for leading clients.

4M+
Sq.ft under development in Pune
10M+
Sq.ft target across India
4
Completed parks in Chakan
MNC
Clientele — Autos, FMCG, Logistics
KSH Infra Advantages
🏗️
Built-to-Suit Capability
Custom PEB structures tailored to tenant requirements
On-Time Delivery Track Record
Demonstrated across 3 completed Chakan parks
🌿
Green Certified Facilities
Energy-efficient design with long-term utility savings
🌐
Global Standards
NBC-compliant fire, electrical, structural systems
KSH Group Companies?
KSH ICD
KSH Distriparks has an Inland Container Depot (ICD, Talegaon) located in Talegaon, Pune. Spread over 17 acres, the facility has a capacity to handle 1,20,000 TEUs
KSH Logistics
KSH brings decades of experience in building supply chains that are smarter, faster, and future-ready. Last-mile delivery, and value-added services, end-to-end solutions designed to keep customers ahead in a dynamic market.
Select KSH Clientele
JABIL
KAWASAKI
JCB
BOSCH
CALLISONS
FAURECIA
UNISOURCE
RENAULT
KIMBERLY CLARK
HYUNDAI CE
KLINGSPOR
LINAMAR
Technical

Specifications

Full technical specifications for Buildings A1 and A2 at KSH Chakan Park 4. Where specs differ, building-specific values are noted.

Structure Type
Pre-Engineered
Building (PEB)
Steel portal frame · Standing seam Galvalume roof · Bare Galvalume color-coated wall cladding
Flooring
FM2 Laser Screed
Anti-termite treatment · 6 ton/m² load capacity · Anti-static finish optionality
Complete Technical Specifications
Parameter Specification
FoundationsOpen type RCC with RCC columns up to plinth level
Plinth Height1.2 m from finished road level
Eave Height9.20 m clear above FFL
Walls250mm thick fly ash brick wall up to 3.5m from FFL — plastered & painted both sides
External FinishSand faced plaster with Apex or equivalent paint
Internal FinishNeeru finish plaster with OBD
Roof Slope1:20
Roof SheetingStanding seam, 0.5mm thick GA Bare Galvalume
Wall CladdingBare Galvalume Color Coated
Interior Column Spacing — A115.30 m × 25.51 m
Interior Column Spacing — A215.00 m × 20.23 m
Bay Spacing — A17.65 m c/c
Bay Spacing — A27.50 m c/c
End FramesNon-expandable rigid frame with gable columns at both ends
Lintel BeamSteel lintel above brick work — entire periphery at 3.0m from FFL
Canopy6.0 m running canopy along length of docking area
SkylightsPolycarbonate sheet for natural lighting
Dock DoorsManual rolling shutter — reputed make
Fire Safety Doors2-hour fire rated with panic bar — reputed make
WindowsFixed — 5mm clear float glass or 2mm polycarbonate for natural light
FlooringFM2 Laser Screed concrete — anti-termite treatment — 6 ton/m²
Power800 kVA with 2 × 630 kVA Transformers
Internal Lighting300 LUX for shop floor
External Lighting15 LUX for dock truck well apron
Fire Protection (Internal)Sprinkler system with hose reels & fire extinguishers — NBC compliant
Fire Protection (External)Hydrant system with posts, water tank & pump room — NBC
Fire AlarmFire alarm & smoke detection — NBC standards
Water SupplyBore wells (park level)
Internal Roads12m wide bitumen/concrete
Roof AccessCage ladder at 2 locations per building
Proposal Notes & Exclusions
Included Notes
Building A2 is ready to move in
Building A1 PEB complete — flooring in progress, ready end March 2026
STP capacity: 36 KLD (park level)
Base building & bare shell office block included
Male toilet blocks: 3 WCs, 3 urinals, 3 wash basins each
Exclusions (Can be discussed as TI)
!Office interiors / fit-outs
!Cranes not provisioned
!Gas banks, scrap rooms
!DG set & associated civil work
!HVAC systems
!Roof insulation
!Solar panels & associated works
!Additional 40,000 sq.ft mezzanine
Lease Structure

Commercials

Base rental, CAM charges, and lease terms for Buildings A1 + A2 combined.

A1 + A2 Combined — Monthly Obligation

Base building rent at ₹32/sq.ft, power amortized over 5 years at ₹2/sq.ft, and CAM at ₹1.10/sq.ft on total chargeable area of 3,67,681 sq.ft.

₹1,29,06,000
per month (approx.) · excl. GST
Term Period
9 Yrs 11 Mo
Lock-in Period
5 Years
Security Deposit
6 Months
Notice Period
6 Months
After lock-in
Escalation
5% p.a.
Year on year
Stamp Duty & Registration
Client's Account
Component
Chargeable Area (sq.ft)
Rate (/sq.ft)
Monthly ()
Building A1 + A2 (Warehouse)
3,45,435
₹32.00
₹1,10,53,930
Office with Mezzanine (G+1)
22,246
₹32.00
₹7,11,859
Power — 800 kVA (Amortized 5 yr)
3,67,681
₹2.00
₹7,35,362
CAM (Common Area Maintenance)
3,67,681
₹1.10
₹4,04,449
Total Monthly (excl. GST)
₹1,29,05,600
CAM Scope — What's Covered
Security fence, CCTV monitoring & manned gate
Car, 2-wheeler parking & visitor management
Common restrooms for drivers
Domestic & flushing water up to building tap-off
STP, septic tank & soak pit operation
Storm water drainage & rainwater harvesting
Common area street lighting with 100% DG backup
Fire hydrant system — park level
Landscaping — perimeter & common areas
HT/LT electrical panels & feeder panels
Client Action Items

TI Requirements Tracker

All tenant improvement and clarification items raised by Dover. Assign ownership, track status, timelines and cost impact. Click any row to edit.

Total Items
44
Across all categories
Open
Awaiting action
Closed / Agreed
Resolved
Cost Impact Items
Require pricing
# Location Requirement / Detail Status Owner Timeline Cost Impact Remarks
Technical Due Diligence

Site Studies

Independent third-party technical reports commissioned by KSH Infra for KSH Chakan Park 4 (Shinde Site). Download originals for your records.

💧
Flood Study Report
Wetinfra Engineering Services · February 2026

Comprehensive flood risk assessment for the 15-acre Shinde site at Chakan. Includes 43-year IMD rainfall analysis, catchment delineation, and underground box drain capacity verification.

  • Average annual rainfall: 1,281 mm (moderately heavy zone)
  • Design intensity: 85.59 mm/hr (10-yr return, 40-min Tc)
  • Box drain (3m × 3m) capacity: 36.14 cumec — exceeds both design scenarios
  • External catchments: C1 = 366 ac, C2 = 10 ac, C3 = 3 ac managed by underground drain
  • Conclusion: No flood risk from external stormwater under either scenario
⬇ Download PDF
🌧️
Nalla Design Report
PriMove Infrastructure Development · January 2024

Hydraulic design of existing natural streams (nalla) for the proposed industrial and logistics park at Shinde Village. CPHEEO-compliant methodology with Rational Method flood estimation.

  • Nalla catchment: 177.96 Ha · flow direction NE → SW
  • Proposed box drain: 3m × 3m concrete section — 15 catch basins along 464m length
  • Design return period: 5 years (industrial) per CPHEEO Table 4.1
  • Drop structures specified to dissipate velocity in steep sections
  • Outfall invert level: 624.605m with adequate downstream gradient
⬇ Download PDF
🚛
Traffic Survey & Geometric Design Review
Sincrono Solutions Pvt Ltd · February 2024

Swept-path analysis and geometric design review for KSH Infra Park VI at Shinde, Tal-Khed. Validates truck circulation, driveway adequacy, and dock ingress/egress for WB-12 design vehicle.

  • Design vehicle: WB-12 Semi-trailer — 15.2m length, 12.2m curb-to-curb turning radius
  • Simultaneous truck movement along A1 & A2 driveways confirmed adequate
  • Egress geometry from all docks along A1 and A2: adequate
  • Ramp slope 1:20 confirmed adequate for WB-12
  • Aided ingress/egress recommended for A2 docks under simultaneous loading
⬇ Download PDF
🏗️
Compound Wall Section Detail
Structural Drawing — KSH Infra Park VI

Structural section drawings for the compound wall at KSH Infra Park VI. Specifies footing design, stone pitching, chainlink fencing detail, and FRL reference levels for site boundary.

  • FRL reference level: 630.50m
  • Foundation: Open RCC to hard strata — 30T SBC
  • Plum concrete using 1:3:6 PCC with rubble (50-50 by volume)
  • Stone pitching with chainlink fencing at top
  • Slope 1:1.5 for retaining sections
⬇ Download PDF
🚢
KSH ICD Talegaon — Value vs JNPT CFS
KSH International Container Depot · 2025–2026

Strategic logistics advantage document comparing KSH's Inland Container Depot (ICD) at Talegaon vs. JNPT CFS routing. Highly relevant for Dover's import/export supply chain optimization from the Chakan facility.

₹2,000
Savings per container vs JNPT
33%
Faster cycle time (2 days vs 3)
115 km
Shorter route per trip average
  • ICD route (JNPT → ICD → Plant → ICD): 130 km vs JNPT CFS 240 km — 46% shorter
  • 24/7 customs clearance at ICD Talegaon — no port congestion dependency
  • NIL vehicle detention & buffer yard charges — direct handover to terminal
  • 180+ own vehicles + 300 vendor fleet for dedicated Dover capacity
  • 7 days free storage + SOC container option eliminates line detention charges
⬇ Download PDF
Visual Documentation

Photos & Videos

Upload and organise site photos, drone footage, and progress videos. Files are saved locally for sharing via link or device.

📸

Drop photos or videos here

Supports JPG, PNG, MP4, MOV · Click or drag to upload

🔗

Add Link

YouTube, Drive, Dropbox, or any image/video URL

🏭
Building A1 — Render (Front Elevation)
A1 Front Render
Building A1 · Rendered Image
📷
Building A1 — Site Photo, Feb 2026
A1 Aerial — 02.02.2026
Building A1 · Actual Photo
🏗️
Building A2 — Render (Corner View)
A2 Corner Render
Building A2 · Rendered Image
📷
Building A2 — Actual, Feb 2026
A2 Ground Level — 02.02.2026
Building A2 · Actual Photo
🚁
Drone Bird's Eye — 02.02.2026
Park Drone View — 02.02.2026
Drone · Full Park
💡
Interior — LED Lighting & Fire Fighting
Shop Floor — Interior
Interior · LED & Fire Systems
🏢
Office Block — External (Kawasaki)
Office Block External
Park · Reference
🔥
Pump Room — Fire Fighting Infrastructure
Park Pump Room
Park · Infrastructure
Sub-Station & Transformer
Park Sub-Station
Park · Electrical